City of Harare, Department of Works
1994
Harare, Highfield-SPCA 750 mm dia steel water pipeline -civil works only.
Duration: 9 months
Value: 1,250,00
City of Harare, Department of Works
1994
Harare, Highfield-SPCA 750 mm dia steel water pipeline -civil works only.
Duration: 9 months
Value: 1,250,00
Irrigation Design and Advisory Services
1994
Glendale, Masembura Pipeline
Duration:
Value: 1,250,000
Chitungwiza Town Council. Consultants: Brian Colquhoun, Hugh O’Donnell & Partners
1995
Zengeza Effluent Pumping Main
Duration: 9 months
Value: 1,747,000
City of Harare. Funded by World Bank
1995
Construction of Water and Sewer Reticulation – Kuwadzana and Warren Park Low cost housing Development. 43.4 Kms of Water and 41.9 Kms of Sewer.
Duration: 12 months
Value: 2,035,000
City of Harare.
1995-1996
Warren – Lochinvar Pipeline -Construction of 750mm dia. trunk water main, valve chambers and pipe bridge.
Duration: 9 months
Value: 2,707,000
City of Harare.
1996-1998
Hatcliffe Sewerage Works – Construction of 2.5ML/Day Biological Nutrient Removal Plant comprising of 5.2 Kms 300mm dia AC outfall sewer and 100 dia water main. Construction of intake works, 76 x 35 x 4.5m deep water retaining biological reactor, Conical clarifier, RAS and MLR pumpstations, holding ponds and 3 no 20 x 75m media filter beds.
Duration: 22 months
Value: 1,200,000
Bindura Town Council. Consultant: Inter- Consult Zimbabwe.
1997-1998
Inter-Consult Zimbabwe – Project No. 2305. Chiwaridzo Township Water Sewerage Reticulation, Roads and Stormwater. 14.6 Kms of water mains, 12.3 Kms Sewer. 2.7 Kms of pumping mains, 14.3 Kms surfaced Roads and lined drains.
Duration: 12 months
Value: 1,642,000
City of Mutare
1997-1998
City of Mutare – Township Development Water and Sewerage Reticulation, Roads and Stormwater. 20.8 Kms Water Reticulation, 9.96 Kms Sewer reticulation and Outfall Sewer. 186m of 375mm dia pipe bridge. 18.14 Kms of Surfaced Roads.
Duration: 24 months
Value: 2.784,000
Government of Zambia. Funding Agency KFW. Consulatants GKW Consult
1996-1999
Chipata, Zambia Water and Sanitation Project – Supply & installation of water distribution network, rehabilitation of Workshops, gravity collection sewer and rehabilitation of existing systems. Construction of septic tanks, manholes, chambers and anaeribic ponds. Installation of sewerage pumps.
Duration: 24 months
Value: 3,368,876
Chitungwiza Town Council
1997-1998
Chitungwiza Trunk Sewers – Phase I Contract 3070/C6. Construction & rehabilitation of 6.7 Kms of Sewer main 375 to 875mm Dia. 6 Kms of Sewer reticulation.
Duration: 24 months
Value: 1,895,000
Chitungwiza Town Council
1998-1999
Chitungwiza Trunk Sewers – Phase II
Outfall sewer.
Duration: 6 months
Value: 1,800,000
City of Harare
1998-1999
Hatcliffe Water Supply Contract DW6/95. Construction of 14.5 Kms of 450 dia 24/18 AC pumping Main, pumpstaion and ancillary works.
Duration: 20 months
Value: 1,250,000
Zimbabwe Reinsurance Corporation
1998-2000
Zimre Park – Main Outfall Sewer, Trunk Water Main, Water and Sewerage Reticulation for 2522 stands. 5.35 Kms AC water main. 3.1 Kms of AC outfall Sewer. 46.7 Kms water and 42.4 Kms sewer reticulation.
Duration: 24 months
Value: 4,124,000
Sunway Developments
1999-2000
.Ventersburg Industrial Development Project
Duration: 12 months
Value: 2,420,000
Lilongwe Water Board, Malawi. Funding Agency: International Development Association/World Bank. Consultants: Sogreah Consultants (France)
2000-2001
Third Lilongwe Water Supply Project – Construction of 9.8 Kms x 800 Dia PN16 Steel Pipeline with interconnecting pipework, 60m span Pipe Bridge and associated valves & fittings. Installation of 2 No 12m3 surge vessels, 700mm dia ultra sonic water meter.
Duration: 12 months
Value: 2,302,444
Municipality of Marondera
1999-2000 | 2002-2003
Rufaro BNR Sewage Treatment Works, construction of sewage Treatment Works – Inlet Works, Bioreactor, clarifier, RAS and WAS pump stations, buildings interconnecting pipework and Maturation Ponds 70,000m3
Duration: 24 months
Value: 7,066,000
Southern Region Water Board, Zomba, Malawi
2001-2002
Rehabilitation of Eight Water Schemes in the Southern Region of Malawi – Installation of 40Kms of pipelines, drilling and equiping boreholes, construction of ground level and elevated storage tanks for 8 towns in Southern Malawi.
Duration: 12 months
Value: 1,668,038
Kintyre Estate
2002
Kintyre Estate – Water supply main, valve chambers and storage reservoir.
Duration: 5 months
Value: 2,600,00
City of Harare
2002
Construction of Budiriro Sewage Pump-station, Civil works
Duration: 6 months
Value: 2,478,000
Zimbabwe National Water Authority
2002
Sadza Growth Point, Zimbabwe Sadza Dam. Construction of 110,000m3 earth filled Dam, spillway and masonary abutments.
Duration: 10 months
Value: 7,307,000
Old Mutual Properties
2002
Bluff Hill Development Area D, Phase 4
Duration: 4 months
Value: 6,610,000
Government of Malawi, Ministry of Water. Funded by World Bank. Consultants: Stantec International Ltd (Canada).
2002-2003
District Water Supply iii Project, Malawi – Construction of 2 no River Intake works, 3 lake intake works, Raw and Pure Water Booster pump stations with associated electrical & mechanical works. Supply and installation of 113 Kms of PVC pipes (100 to 200mm Dia). Construction of 6 No RC Resevoirs (500 to 1500m3 Capacity). Construction of 11 no office Blocks and 18 No houses.
Duration: 18 months
Value: 6,828,000
Hotland Enterprises
2002-2003
Guildford Bulkwater supply, concrete reservoir, water reticulation – 1.8 Kms bulk water supply RC Reservoir, booster pump station and elevated tank.
Duration: 19 months
Value: 2,494,000
Old Mutual Properties
2002-2003
Bluff Hill, Area C Phases 1 & 2 Water and sewage reticulation
Duration: 7 months
Value: 3,249, 453
CABS/Mashonaland Turf Club
2003
Outfall Sewer on Borrowdale Road development 1.4 Kms of Outfall Sewer
Duration: 4 months
Value: 1,607,000
City of Harare
2011-2012
COH – IDBZ – Plant Hire
Duration: 12 months
Value: 1,182,119
Chitungwiza Municipality. Funded by: AfDB Bank
2012-2013
Chitingwiza Emergency Rehabilitation of Water and Sewer – Rehabilitation of 3 sewer pump stations, including replacement of pumps, construction of new intake grit chambers and cleaning of ponds. Removal and replacement of old trunk sewers. Replacement water meters, gate valves and pressure reducing valves on Water Mains.
Duration: 7 months
Value: 2,400,000
Anglo American Platinu
2011-2013
Unki Mining House Project – Supply and installation of 7.2 Kms of water mains – 200 to 250mm dia, 12.4 Kms of Water reticulation – 75 to 160mm dia, 2.9 Kms of Sewer Rising and outfall Mains – 200 to 400mm dia, 12.4 Kms of Sewer Reticulation – 110 to 160mm dia and 900 house connection.
Duration: 16 months
Value: 4,508,299
Gye Nyame
2011-2014
Gye Nyame Mining Project – Construction of Infrastructure and Mining for Diamond Mine.
Duration: 24 months
Value: 1,440,000
Old Mutual Properties
2013
ZRP Hatcliffe – Water & sewer Mains and Reticulation for Housing Development.
Duration: 10 months
Value: 1,525,000
Zimasco
2013-2015
Chrome Mining in Darwendale – Mining of 4,000 Tons Chrome Ore per month.
Duration: 20 months
Value: 2,708,204
Crown Agents/AfDB
2013-2014
Rehabilitation of Ponds at the Sewage Treatment Works in Harare and Chitungwiza – Removal of 200,000m3 of sludge, Embankment Repairs, Rehabilitation of Outfall Sewers and associated Concrete works.
Duration: 12 months
Value: 2,500,000
Bilboes Holdings
2014-2017
Isabella Mine – Gold Mining in Matabeleland – Loading and Hauling of 45,000m3 of Ore and Waste Per Month
Duration: 42 months
Value: 6,300,000
Rio Zim
2015-2018
Cam & Motor – Contract Gold Mining in Kadoma – Loading and hauling 60,000m3 per month of waste and ore. Haulage of 24,000 tons per month of ore to processing plant 50 Kms away.
Duration: 37 months
Value: 20,614,126
Rio Zim
2016-2018
Dalny Mine – Gold Mining in Chakari
Duration: 21 months
Value: 5,158,655
Crown Agents Limited
2017-2018
Replacement of water and sewer pipelines and Associated works in Harare’ Lot 1 and Lot 3
Duration: 9 months
Value: 4,274,670
Old Mutual
2017-2018
Sewer and Water reticulation for CABS Housing development.
Duration: 7 months
Value: 2,100,00
Freda Rebecca
2018-2019
Haulage for Freda Rebecca Gold Mine
Duration: 24 months
Value: 4,680,000
Turbo Mining
2019-2020
Western Coal Mine – Phase 1
Duration: 12 months
Value: 4,765,887
Consortium Sesani, IWR,RD
2019
Kilimanjaro – Bush Clearing Land Prep, Night Storage Dams & Roads
Duration: 8 months
Value: 1,544,818