City of Harare, Department of Works

1994

Harare, Highfield-SPCA 750 mm dia steel water pipeline -civil works only.

Duration: 9 months

Value: 1,250,00

Irrigation Design and Advisory Services

1994

Glendale, Masembura Pipeline

Duration:

Value: 1,250,000

Chitungwiza Town Council. Consultants: Brian Colquhoun, Hugh O’Donnell & Partners

1995

Zengeza Effluent Pumping Main

Duration: 9 months

Value: 1,747,000

City of Harare. Funded by World Bank

1995

Construction of Water and Sewer Reticulation – Kuwadzana and Warren Park Low cost housing Development. 43.4 Kms of Water and 41.9 Kms of Sewer.

Duration: 12 months

Value: 2,035,000

City of Harare.

1995-1996

Warren – Lochinvar Pipeline -Construction of 750mm dia. trunk water main, valve chambers and pipe bridge.

Duration: 9 months

Value: 2,707,000

City of Harare.

1996-1998

Hatcliffe Sewerage Works – Construction of 2.5ML/Day Biological Nutrient Removal Plant comprising of 5.2 Kms 300mm dia AC outfall sewer and 100 dia water main. Construction of intake works, 76 x 35 x 4.5m deep water retaining biological reactor, Conical clarifier, RAS and MLR pumpstations, holding ponds and 3 no 20 x 75m media filter beds.

Duration: 22 months

Value: 1,200,000

Bindura Town Council. Consultant: Inter- Consult Zimbabwe.

1997-1998

Inter-Consult Zimbabwe – Project No. 2305. Chiwaridzo Township Water Sewerage Reticulation, Roads and Stormwater. 14.6 Kms of water mains, 12.3 Kms Sewer. 2.7 Kms of pumping mains, 14.3 Kms surfaced Roads and lined drains.

Duration: 12 months

Value: 1,642,000

City of Mutare

1997-1998

City of Mutare – Township Development Water and Sewerage Reticulation, Roads and Stormwater. 20.8 Kms Water Reticulation, 9.96 Kms Sewer reticulation and Outfall Sewer. 186m of 375mm dia pipe bridge. 18.14 Kms of Surfaced Roads.

Duration: 24 months

Value: 2.784,000

Government of Zambia. Funding Agency KFW. Consulatants GKW Consult

1996-1999

Chipata, Zambia Water and Sanitation Project – Supply & installation of water distribution network, rehabilitation of Workshops, gravity collection sewer and rehabilitation of existing systems. Construction of septic tanks, manholes, chambers and anaeribic ponds. Installation of sewerage pumps.

Duration: 24 months

Value: 3,368,876

Chitungwiza Town Council

1997-1998

Chitungwiza Trunk Sewers – Phase I Contract 3070/C6. Construction & rehabilitation of 6.7 Kms of Sewer main 375 to 875mm Dia. 6 Kms of Sewer reticulation.

Duration: 24 months

Value: 1,895,000

Chitungwiza Town Council

1998-1999

Chitungwiza Trunk Sewers – Phase II

Outfall sewer.

Duration: 6 months

Value: 1,800,000

City of Harare

1998-1999

Hatcliffe Water Supply Contract DW6/95. Construction of 14.5 Kms of 450 dia 24/18 AC pumping Main, pumpstaion and ancillary works.

Duration: 20 months

Value: 1,250,000

Zimbabwe Reinsurance Corporation

1998-2000

Zimre Park – Main Outfall Sewer, Trunk Water Main, Water and Sewerage Reticulation for 2522 stands. 5.35 Kms AC water main. 3.1 Kms of AC outfall Sewer. 46.7 Kms water and 42.4 Kms sewer reticulation.

Duration: 24 months

Value: 4,124,000

Sunway Developments

1999-2000

.Ventersburg Industrial Development Project

Duration: 12 months

Value: 2,420,000

Lilongwe Water Board, Malawi. Funding Agency: International Development Association/World Bank. Consultants: Sogreah Consultants (France)

2000-2001

Third Lilongwe Water Supply Project – Construction of 9.8 Kms x 800 Dia PN16 Steel Pipeline with interconnecting pipework, 60m span Pipe Bridge and associated valves & fittings. Installation of 2 No 12m3 surge vessels, 700mm dia ultra sonic water meter.

Duration: 12 months

Value: 2,302,444

Municipality of Marondera

1999-2000 | 2002-2003

Rufaro BNR Sewage Treatment Works, construction of sewage Treatment Works – Inlet Works, Bioreactor, clarifier, RAS and WAS pump stations, buildings interconnecting pipework and Maturation Ponds 70,000m3

Duration: 24 months

Value: 7,066,000

Southern Region Water Board, Zomba, Malawi

2001-2002

Rehabilitation of Eight Water Schemes in the Southern Region of Malawi – Installation of 40Kms of pipelines, drilling and equiping boreholes, construction of ground level and elevated storage tanks for 8 towns in Southern Malawi.

Duration: 12 months

Value: 1,668,038

Kintyre Estate

2002

Kintyre Estate – Water supply main, valve chambers and storage reservoir.

Duration: 5 months

Value: 2,600,00

City of Harare

2002

Construction of Budiriro Sewage Pump-station, Civil works

Duration: 6 months

Value: 2,478,000

Zimbabwe National Water Authority

2002

Sadza Growth Point, Zimbabwe Sadza Dam. Construction of 110,000m3 earth filled Dam, spillway and masonary abutments.

Duration: 10 months

Value: 7,307,000

Old Mutual Properties

2002

Bluff Hill Development Area D, Phase 4

Duration: 4 months

Value: 6,610,000

Government of Malawi, Ministry of Water. Funded by World Bank. Consultants: Stantec International Ltd (Canada).

2002-2003

District Water Supply iii Project, Malawi – Construction of 2 no River Intake works, 3 lake intake works, Raw and Pure Water Booster pump stations with associated electrical & mechanical works. Supply and installation of 113 Kms of PVC pipes (100 to 200mm Dia). Construction of 6 No RC Resevoirs (500 to 1500m3 Capacity). Construction of 11 no office Blocks and 18 No houses.

Duration: 18 months

Value: 6,828,000

Hotland Enterprises

2002-2003

Guildford Bulkwater supply, concrete reservoir, water reticulation – 1.8 Kms bulk water supply RC Reservoir, booster pump station and elevated tank.

Duration: 19 months

Value: 2,494,000

Old Mutual Properties

2002-2003

Bluff Hill, Area C Phases 1 & 2 Water and sewage reticulation

Duration: 7 months

Value: 3,249, 453

CABS/Mashonaland Turf Club

2003

Outfall Sewer on Borrowdale Road development 1.4 Kms of Outfall Sewer

Duration: 4 months

Value: 1,607,000

City of Harare

2011-2012

COH – IDBZ – Plant Hire

Duration: 12 months

Value: 1,182,119

Chitungwiza Municipality. Funded by: AfDB Bank

2012-2013

Chitingwiza Emergency Rehabilitation of Water and Sewer – Rehabilitation of 3 sewer pump stations, including replacement of pumps, construction of new intake grit chambers and cleaning of ponds. Removal and replacement of old trunk sewers. Replacement water meters, gate valves and pressure reducing valves on Water Mains.

Duration: 7 months

Value: 2,400,000

Anglo American Platinu

2011-2013

Unki Mining House Project – Supply and installation of 7.2 Kms of water mains – 200 to 250mm dia, 12.4 Kms of Water reticulation – 75 to 160mm dia, 2.9 Kms of Sewer Rising and outfall Mains – 200 to 400mm dia, 12.4 Kms of Sewer Reticulation – 110 to 160mm dia and 900 house connection.

Duration: 16 months

Value: 4,508,299

Gye Nyame

2011-2014

Gye Nyame Mining Project – Construction of Infrastructure and Mining for Diamond Mine.

Duration: 24 months

Value: 1,440,000

Old Mutual Properties

2013

ZRP Hatcliffe – Water & sewer Mains and Reticulation for Housing Development.

Duration: 10 months

Value: 1,525,000

Zimasco

2013-2015

Chrome Mining in Darwendale – Mining of 4,000 Tons Chrome Ore per month.

Duration: 20 months

Value: 2,708,204

Crown Agents/AfDB

2013-2014

Rehabilitation of Ponds at the Sewage Treatment Works in Harare and Chitungwiza – Removal of 200,000m3 of sludge, Embankment Repairs, Rehabilitation of Outfall Sewers and associated Concrete works.

Duration: 12 months

Value: 2,500,000

Bilboes Holdings

2014-2017

Isabella Mine – Gold Mining in Matabeleland – Loading and Hauling of 45,000m3 of Ore and Waste Per Month

Duration: 42 months

Value: 6,300,000

Rio Zim

2015-2018

Cam & Motor – Contract Gold Mining in Kadoma – Loading and hauling 60,000m3 per month of waste and ore. Haulage of 24,000 tons per month of ore to processing plant 50 Kms away.

Duration: 37 months

Value: 20,614,126

Rio Zim

2016-2018

Dalny Mine – Gold Mining in Chakari

Duration: 21 months

Value: 5,158,655

Crown Agents Limited

2017-2018

Replacement of water and sewer pipelines and Associated works in Harare’ Lot 1 and Lot 3

Duration: 9 months

Value: 4,274,670

Old Mutual

2017-2018

Sewer and Water reticulation for CABS Housing development.

Duration: 7 months

Value: 2,100,00

Freda Rebecca

2018-2019

Haulage for Freda Rebecca Gold Mine

Duration: 24 months

Value: 4,680,000

Turbo Mining

2019-2020

Western Coal Mine – Phase 1

Duration: 12 months

Value: 4,765,887

Consortium Sesani, IWR,RD

2019

Kilimanjaro – Bush Clearing Land Prep, Night Storage Dams & Roads

Duration: 8 months

Value: 1,544,818