Industrial and residential water
reticulation networks
Water treatment works
Pump stations
Reservoirs
Replacement of Critical Sections along Water Pumping Mains in the Distribution System. This consisted of 5.5km of 600mm and 0,6km of 500mm GRP piping water pumping mains. Construction of Isolation and Scour Valve chambers at Donnybrook line as well as the installation and commissioning of 16No. Electrical magnetic flow meters.
Harare, Highfield-SPCA 750 mm dia steel water pipeline -civil works only.
Duration: 9 months
Value: 1,250,00
Consultant: Inter- Consult Zimbabwe.
Inter-Consult Zimbabwe – Project No. 2305. Chiwaridzo Township Water Sewerage Reticulation, Roads and Stormwater. 14.6 Kms of water mains, 12.3 Kms Sewer. 2.7 Kms of pumping mains, 14.3 Kms surfaced Roads and lined drains.
Duration: 12 months
Value: 1,642,000